<?xml version="1.0" encoding="UTF-8"?><rss version="2.0" xmlns:itunes="http://www.itunes.com/dtds/podcast-1.0.dtd"><channel><title>Base Daily</title><link>https://company-daily.otnarat.workers.dev/companies/base-power/</link><description>A daily operating record of Base Power Company, its battery fleet, factories, deployments, electricity business, utility partnerships, and market context.</description><language>en-us</language><itunes:author>Company Daily</itunes:author><itunes:explicit>false</itunes:explicit><itunes:image href="https://company-daily.otnarat.workers.dev/assets/company-daily-cover.jpg"/><image><url>https://company-daily.otnarat.workers.dev/assets/company-daily-cover.jpg</url><title>Base Daily</title><link>https://company-daily.otnarat.workers.dev/companies/base-power/</link></image><lastBuildDate>Thu, 17 Sep 2026 12:28:45 GMT</lastBuildDate><item><title>September 17, 2026: Base holds retail pricing steady while support docs and hiring shift</title><link>https://company-daily.otnarat.workers.dev/companies/base-power/2026-09-17/</link><guid isPermaLink="true">https://company-daily.otnarat.workers.dev/companies/base-power/2026-09-17/</guid><pubDate>Thu, 17 Sep 2026 12:00:00 GMT</pubDate><description>Base did not show a major operating step-up on September 17. The consumer offer stayed fixed, a generator-recharge help page was updated, and new Austin internship postings appeared. The key unresolved question remains whether any ERCOT or PUCT filing proves Base’s batteries are actually qualified for ADER dispatch. AI-generated narration when audio is present.</description><category>Base Daily</category><itunes:author>Base Daily</itunes:author><itunes:duration>330</itunes:duration><itunes:explicit>false</itunes:explicit><enclosure url="https://company-daily.otnarat.workers.dev/audio/base-power/2026-09-17/42433400f815fe26bb3d1b0c24cf67e2e3d0947ec9412381bf7d2a316c266b43.mp3" length="5543272" type="audio/mpeg"/></item><item><title>September 16, 2026: Base holds retail pricing while hiring stays active</title><link>https://company-daily.otnarat.workers.dev/companies/base-power/2026-09-16/</link><guid isPermaLink="true">https://company-daily.otnarat.workers.dev/companies/base-power/2026-09-16/</guid><pubDate>Wed, 16 Sep 2026 12:00:00 GMT</pubDate><description>Base Power’s public offer is unchanged, the support docs look steady, and fresh Ashby postings point to continued hiring across finance, deployment, supply chain, and marketing. The main unresolved question remains whether any of that translates into ERCOT-qualified operating evidence for the battery fleet. AI-generated narration when audio is present.</description><category>Base Daily</category><itunes:author>Base Daily</itunes:author><itunes:duration>330</itunes:duration><itunes:explicit>false</itunes:explicit><enclosure url="https://company-daily.otnarat.workers.dev/audio/base-power/2026-09-16/ac5f0822a9abc6526dec859fa5ec1452c815b9f0a4a04d20ac7fd5fffb234416.mp3" length="5203054" type="audio/mpeg"/></item><item><title>September 15, 2026: Base’s battery lineup expands, but the big questions stay open</title><link>https://company-daily.otnarat.workers.dev/companies/base-power/2026-09-15/</link><guid isPermaLink="true">https://company-daily.otnarat.workers.dev/companies/base-power/2026-09-15/</guid><pubDate>Tue, 15 Sep 2026 12:00:00 GMT</pubDate><description>Base’s public docs now describe a broader battery lineup, while the main unresolved questions remain wholesale qualification, factory proof, and reliability signals. AI-generated narration when audio is present.</description><category>Base Daily</category><itunes:author>Base Daily</itunes:author><itunes:duration>300</itunes:duration><itunes:explicit>false</itunes:explicit><enclosure url="https://company-daily.otnarat.workers.dev/audio/base-power/2026-09-15/45dbbbc5e3d056af7b27bfd30ed90cc4aaab4f78dba797ce81b568d85849ebff.mp3" length="4943082" type="audio/mpeg"/></item><item><title>September 12, 2026: Base still looks permit-led, not market-proven</title><link>https://company-daily.otnarat.workers.dev/companies/base-power/2026-09-12/</link><guid isPermaLink="true">https://company-daily.otnarat.workers.dev/companies/base-power/2026-09-12/</guid><pubDate>Sat, 12 Sep 2026 12:00:00 GMT</pubDate><description>An incremental update on Base Power Company. The clearest new signals are small support-site growth, unchanged pricing language, and two Texas permit records that remain in Review Complete, while ERCOT’s ADER qualification path is still unresolved. AI-generated narration when audio is present.</description><category>Base Daily</category><itunes:author>Base Daily</itunes:author><itunes:duration>300</itunes:duration><itunes:explicit>false</itunes:explicit><enclosure url="https://company-daily.otnarat.workers.dev/audio/base-power/2026-09-12/ee6bc02d0c713b75086b0f87a68e9a5a56eb330861edec91f952eeff333e99b3.mp3" length="4900443" type="audio/mpeg"/></item><item><title>August 28, 2026: ERCOT’s ADER process keeps Base on the board</title><link>https://company-daily.otnarat.workers.dev/companies/base-power/2026-08-28/</link><guid isPermaLink="true">https://company-daily.otnarat.workers.dev/companies/base-power/2026-08-28/</guid><pubDate>Fri, 28 Aug 2026 12:00:00 GMT</pubDate><description>A calm update on Base Power’s latest operating evidence: ERCOT’s ADER workstream, stable consumer-facing pages, and permit-side progress in Texas. The big question remains unchanged: when, if ever, does Base turn process proof into qualified, dispatchable grid proof? AI-generated narration when audio is present.</description><category>Base Daily</category><itunes:author>Base Daily</itunes:author><itunes:duration>300</itunes:duration><itunes:explicit>false</itunes:explicit><enclosure url="https://company-daily.otnarat.workers.dev/audio/base-power/2026-08-28/e1edddab8cf8d6229962c9b3df1d0a0052006bc81e4a89ee52ce4d611699d711.mp3" length="5226613" type="audio/mpeg"/></item><item><title>August 27, 2026: Base’s ADER paperwork keeps moving</title><link>https://company-daily.otnarat.workers.dev/companies/base-power/2026-08-27/</link><guid isPermaLink="true">https://company-daily.otnarat.workers.dev/companies/base-power/2026-08-27/</guid><pubDate>Thu, 27 Aug 2026 12:00:00 GMT</pubDate><description>Base Power’s freshest public signal is technical, not commercial: ERCOT posted a Base ADER update deck and a DSWG agenda slot, while Texas permit records show a separate buildout thread still advancing. Consumer pricing and the public offer pages look stable, but the key unresolved question remains whether Base’s claimed fleet scale is translating into qualified, dispatchable ERCOT assets. AI-generated narration when audio is present.</description><category>Base Daily</category><itunes:author>Base Daily</itunes:author><itunes:duration>330</itunes:duration><itunes:explicit>false</itunes:explicit><enclosure url="https://company-daily.otnarat.workers.dev/audio/base-power/2026-08-27/5f347e265d2e2a090441624b9b52d4705379e20f7eedd9b5481afa7eee5b8553.mp3" length="5326921" type="audio/mpeg"/></item><item><title>August 25, 2026: Base keeps scaling, but ERCOT proof is still the missing piece</title><link>https://company-daily.otnarat.workers.dev/companies/base-power/2026-08-25/</link><guid isPermaLink="true">https://company-daily.otnarat.workers.dev/companies/base-power/2026-08-25/</guid><pubDate>Tue, 25 Aug 2026 12:00:00 GMT</pubDate><description>Base’s public story is getting stronger on deployment and manufacturing, while the key unanswered question remains whether its batteries have crossed from product rollout into publicly documented ERCOT participation. AI-generated narration when audio is present.</description><category>Base Daily</category><itunes:author>Base Daily</itunes:author><itunes:duration>330</itunes:duration><itunes:explicit>false</itunes:explicit><enclosure url="https://company-daily.otnarat.workers.dev/audio/base-power/2026-08-25/07630f7bbdc7e11706738c98e3ae4a90a316ac86f60b60ad5249bf904c636877.mp3" length="5442277" type="audio/mpeg"/></item><item><title>August 24, 2026: Base’s ERCOT volume update is still not dispatch proof</title><link>https://company-daily.otnarat.workers.dev/companies/base-power/2026-08-24/</link><guid isPermaLink="true">https://company-daily.otnarat.workers.dev/companies/base-power/2026-08-24/</guid><pubDate>Mon, 24 Aug 2026 12:00:00 GMT</pubDate><description>Base Power’s newest public signal is a company-hosted ERCOT update, but the key question remains unresolved: can its battery fleet be independently verified as an active grid resource, or is the story still mostly permits, product pages, and hiring? AI-generated narration when audio is present.</description><category>Base Daily</category><itunes:author>Base Daily</itunes:author><itunes:duration>300</itunes:duration><itunes:explicit>false</itunes:explicit><enclosure url="https://company-daily.otnarat.workers.dev/audio/base-power/2026-08-24/c46e52838d6135111c0c6ce636a8be97660856100faf945e6e2a691af0b63465.mp3" length="4738436" type="audio/mpeg"/></item><item><title>August 21, 2026: Base stays on the permit-and-pricing track</title><link>https://company-daily.otnarat.workers.dev/companies/base-power/2026-08-21/</link><guid isPermaLink="true">https://company-daily.otnarat.workers.dev/companies/base-power/2026-08-21/</guid><pubDate>Fri, 21 Aug 2026 12:00:00 GMT</pubDate><description>Base Power’s public picture is still centered on a stable consumer price card, a permit record that has advanced but does not prove occupancy, and an ERCOT ADER path that still needs a public qualification trail before any dispatch claim can be treated as proven. AI-generated narration when audio is present.</description><category>Base Daily</category><itunes:author>Base Daily</itunes:author><itunes:duration>330</itunes:duration><itunes:explicit>false</itunes:explicit><enclosure url="https://company-daily.otnarat.workers.dev/audio/base-power/2026-08-21/b54d4d67685fd4e009b87cf7d19d3598201c86d908fee381c98267b3edcd9ae5.mp3" length="5392961" type="audio/mpeg"/></item><item><title>August 20, 2026: Base refreshes pricing, product mix stays split</title><link>https://company-daily.otnarat.workers.dev/companies/base-power/2026-08-20/</link><guid isPermaLink="true">https://company-daily.otnarat.workers.dev/companies/base-power/2026-08-20/</guid><pubDate>Thu, 20 Aug 2026 12:00:00 GMT</pubDate><description>Base Power refreshed its public pricing surface again, but the bigger unresolved question remains whether any public record now shows dispatch, qualification, or onsite operating proof for the battery fleet. AI-generated narration when audio is present.</description><category>Base Daily</category><itunes:author>Base Daily</itunes:author><itunes:duration>330</itunes:duration><itunes:explicit>false</itunes:explicit><enclosure url="https://company-daily.otnarat.workers.dev/audio/base-power/2026-08-20/9a7a448f3d507e280d1f55b5f2eb650174bcc7439ea87d8a236cb16bf80b2083.mp3" length="5062350" type="audio/mpeg"/></item><item><title>August 19, 2026: Base widens plans, while its buildout stays permit-side</title><link>https://company-daily.otnarat.workers.dev/companies/base-power/2026-08-19/</link><guid isPermaLink="true">https://company-daily.otnarat.workers.dev/companies/base-power/2026-08-19/</guid><pubDate>Wed, 19 Aug 2026 12:00:00 GMT</pubDate><description>Base Power’s public product page now shows a wider plan matrix, while fresh Texas permit records add another breadcrumb on office and factory buildout. The core operating question remains the same: how much of the battery fleet is actually qualified, deployed, and supporting the grid. AI-generated narration when audio is present.</description><category>Base Daily</category><itunes:author>Base Daily</itunes:author><itunes:duration>300</itunes:duration><itunes:explicit>false</itunes:explicit><enclosure url="https://company-daily.otnarat.workers.dev/audio/base-power/2026-08-19/056a610dab639b4ab4ff623f89cf44640cdfd65e8fb32761e3ac94f2d84a21f2.mp3" length="4984195" type="audio/mpeg"/></item><item><title>August 18, 2026: Base adds a new Austin buildout breadcrumb</title><link>https://company-daily.otnarat.workers.dev/companies/base-power/2026-08-18/</link><guid isPermaLink="true">https://company-daily.otnarat.workers.dev/companies/base-power/2026-08-18/</guid><pubDate>Tue, 18 Aug 2026 12:00:00 GMT</pubDate><description>Base Power’s latest public signals are incremental but useful: a new TDLR filing for an Austin office finish-out, refreshed hardware and contract language, and an unchanged set of utility and ERCOT threads that still need harder proof. AI-generated narration when audio is present.</description><category>Base Daily</category><itunes:author>Base Daily</itunes:author><itunes:duration>300</itunes:duration><itunes:explicit>false</itunes:explicit><enclosure url="https://company-daily.otnarat.workers.dev/audio/base-power/2026-08-18/7b893cf8ce32af55334f432962b7f01abe9045533acb29fdfd5889bbc99cfac8.mp3" length="4841251" type="audio/mpeg"/></item><item><title>August 17, 2026: Base Power Daily: a new PUCT filing, but still no public dispatch proof</title><link>https://company-daily.otnarat.workers.dev/companies/base-power/2026-08-17/</link><guid isPermaLink="true">https://company-daily.otnarat.workers.dev/companies/base-power/2026-08-17/</guid><pubDate>Mon, 17 Aug 2026 12:00:00 GMT</pubDate><description>On 2026-08-17, the newest public breadcrumb for Base is a PUCT filing for its 2026 semi-annual retail report. Base’s customer pages, billing help, and plan lineup still look steady, and the main open question remains whether any Base fleet has public ADER qualification or dispatch data. AI-generated narration when audio is present.</description><category>Base Daily</category><itunes:author>Base Daily</itunes:author><itunes:duration>450</itunes:duration><itunes:explicit>false</itunes:explicit><enclosure url="https://company-daily.otnarat.workers.dev/audio/base-power/2026-08-17/fa97c4f703329e6936aa22bce0d47a4eb039f89ae39d4bd14a7549ac2e20fb8b.mp3" length="6237653" type="audio/mpeg"/></item><item><title>August 16, 2026: Base Power on 2026-08-16: the proof gap is still the story</title><link>https://company-daily.otnarat.workers.dev/companies/base-power/2026-08-16/</link><guid isPermaLink="true">https://company-daily.otnarat.workers.dev/companies/base-power/2026-08-16/</guid><pubDate>Sun, 16 Aug 2026 12:00:00 GMT</pubDate><description>No material Base-specific change surfaced today. The clearest live signals remain Base Core’s public spec, active field and electrical hiring, Austin Energy’s 40 MW agreement, and unresolved questions about ADER qualification and factory buildout. AI-generated narration when audio is present.</description><category>Base Daily</category><itunes:author>Base Daily</itunes:author><itunes:duration>480</itunes:duration><itunes:explicit>false</itunes:explicit><enclosure url="https://company-daily.otnarat.workers.dev/audio/base-power/2026-08-16/d6695dcaf86dde41e28291b1229cd47634830d1b7d7cbf6dc08a77626ec7830f.mp3" length="6492606" type="audio/mpeg"/></item><item><title>August 15, 2026: The dispatchable capacity gap</title><link>https://company-daily.otnarat.workers.dev/companies/base-power/2026-08-15/</link><guid isPermaLink="true">https://company-daily.otnarat.workers.dev/companies/base-power/2026-08-15/</guid><pubDate>Sat, 15 Aug 2026 12:00:00 GMT</pubDate><description>No verified material Base-specific change surfaced on August 15. Today’s episode uses the quiet day to examine the unresolved gap between Base’s announced battery scale and public proof of qualified, dispatchable capacity. AI-generated narration when audio is present.</description><category>Base Daily</category><itunes:author>Base Daily</itunes:author><itunes:duration>450</itunes:duration><itunes:explicit>false</itunes:explicit><enclosure url="https://company-daily.otnarat.workers.dev/audio/base-power/2026-08-15/8fbef923a1beb71fb4f9255a79c8be80d3482ea78bbb4a92e71ab4a7af8a551f.mp3" length="7257472" type="audio/mpeg"/></item><item><title>August 14, 2026: The deployment pipe</title><link>https://company-daily.otnarat.workers.dev/companies/base-power/2026-08-14/</link><guid isPermaLink="true">https://company-daily.otnarat.workers.dev/companies/base-power/2026-08-14/</guid><pubDate>Fri, 14 Aug 2026 12:00:00 GMT</pubDate><description>No verified material Base-specific news for August 14. Today focuses on the gap between factory output and installed, commissioned grid assets. AI-generated narration when audio is present.</description><category>Base Daily</category><itunes:author>Base Daily</itunes:author><itunes:duration>420</itunes:duration><itunes:explicit>false</itunes:explicit><enclosure url="https://company-daily.otnarat.workers.dev/audio/base-power/2026-08-14/8f01c519745393e916b34f1862da3681395290b96240a3e7e354879473c42741.mp3" length="8480832" type="audio/mpeg"/></item><item><title>August 13, 2026: The failure loop</title><link>https://company-daily.otnarat.workers.dev/companies/base-power/2026-08-13/</link><guid isPermaLink="true">https://company-daily.otnarat.workers.dev/companies/base-power/2026-08-13/</guid><pubDate>Thu, 13 Aug 2026 12:00:00 GMT</pubDate><description>A new field-reliability role reveals how Base intends to turn fleet failures and returned hardware into design, manufacturing, and supplier fixes. AI-generated narration when audio is present.</description><category>Base Daily</category><itunes:author>Base Daily</itunes:author><itunes:duration>480</itunes:duration><itunes:explicit>false</itunes:explicit></item><item><title>August 12, 2026: The factory behind the factory</title><link>https://company-daily.otnarat.workers.dev/companies/base-power/2026-08-12/</link><guid isPermaLink="true">https://company-daily.otnarat.workers.dev/companies/base-power/2026-08-12/</guid><pubDate>Wed, 12 Aug 2026 12:00:00 GMT</pubDate><description>A deployment-process role and three Austin construction filings point to the operational bottleneck behind Base&apos;s manufacturing expansion. AI-generated narration when audio is present.</description><category>Base Daily</category><itunes:author>Base Daily</itunes:author><itunes:duration>480</itunes:duration><itunes:explicit>false</itunes:explicit></item></channel></rss>